Ecohydrological study for the PAS custom area 'Turnhouts Vennengebied' (EVINBO)
Turnhouts Vennengebied (photo Yves Adams - Vildaphoto)
Details
At the request of the intendant of the PAS custom area Turnhouts Vennengebied, INBO carries out an ecohydrological study in order to support the hydrological and soil restoration, and the nature target allocation. The aim of phase 1 is to synthesize existing data and information, to better define knowledge gaps, and to provide some preliminary proposals of measures. The aim of phases 2-5 is to underpin scenarios of measures that would lead to the realisation of a favourable conservation status for nature targets. Phase 2 is aimed at data collection, phase 3 at generating predictive tools, phase 4 at composing scenarios of measures and predicting effects, and phase 5 is aimed at further elaborating the preferential scenario.Status | Running |
---|---|
Actual start/end date | 30/06/2022 - 30/12/2025 |
Teams
- Environment and Climate
- Freshwater Habitats
- Biometry, Methodology and Quality Assurance
- Wildlife Management and Invasive Species
- Estuaries
INBO Research theme(s)
- Water
- Soil & air