Gedaan met laden. U bevindt zich op: Slibbalans Zeeschelde. Sub report 8. Hydrodynamic model 1954

Slibbalans Zeeschelde. Sub report 8. Hydrodynamic model 1954

Project "00_029_Slibbalans Zeeschelde" aims to study the mud balance in the Scheldt Estuary in a historical perspective. One of the tasks identified in the projectplan is to hindcast a historical situation, first in a hydrodynamical model, then as mud transport model. The present document describes the model setups of NEVLA 2009, SCALDIS 2013 and their 1954 counterparts. The predictive ability of both models is evaluated against measurements. Due to less detailed topographic, hydrological and hydrodynamic information of 1954, a sensitivity analysis is performed on the 1954 models to evaluate the reaction of the model to changes in bathymetry, bottom roughness and viscosity.
Publicatiedatum
December 2017
Publicatietype
Onderzoeksrapport
Thema's
Scheepvaart, waterwegen en zeewezen
Auteur(s)
A. Dujardin, D. Meire, K. Chu, J. Vanlede, Y. Plancke, F. Mostaert
Reeks
FHR reports